Nitesh Fisher Island Goa : Master Plan

Structure Vill h ll h Villas shall have RCC frame & the structural design will conform to Seismic Zone III requirements.
DOORS & WINDOWS
Main Door Polished Teakwood frame & shutter
Toilet Doors Polished Teakwood frame with one side teak and
other side laminate finish, flush shutter
Other Internal Doors Polished Teakwood frame with both side teak, flush
shutter
All external Doors & Windows Glazed UPVC
FLOORING
Living, Dining, family room & transition spaces Italian marble- Crema Marfil or Equivalent.
Kitchen & Utility/ Wet kitchen Vitrified tiles
Master Bed room Timber flooring
All Bedrooms except Master Bed room. Italian marble- Crema Marfil or Equivalent.
Fitness Centre Timber flooring
Entertainment room Italian marble- Crema Marfil or Equivalent.
Balconies, sit outs & accessible terraces Anti skid Vitrified tiles
Villa Bathrooms Italian marble- Crema Marfil or Equivalent.
Maid's room etc Vitrified tiles
Portico Concrete Paver blocks
INTERNAL STAIRCASE
Internal Staircases-Flooring Italian marble/ Hardwood
Handrail/ Balusters Wooden and Stainless Steel design.
Balustrade panels Panel of toughened glass
DADO
Bathrooms Approved Italian marble up to false ceiling height
Maid Bathroom Vitrified tiles up to false ceiling height
Kitchen & Utility Vitrified tiles over counter up to 2' height
KITCHEN
Modular Kitchen of Poggen Pohl or equivalent make with Granite counter top,built in Hood, 4 Burner-hob, Stainless steel sink with Hot &cold water mixer,Microwave oven, Fridge, Water Purifier of reputed make.
WET KITCHEN
Granite counter with Stainless steel sink.
Washing machine & dryer,Dish washer of reputed make
BATHROOMS
  • Italian marble vanity counter, counter top wash basins & CP mixer taps
  • Chromium plated fittings & Wall mounted EWC's
  • Shower cubicles / Bath tubs as per Villa Plans.
  • (Kohler/ Toto / Duravit or equivalent make Fixtures and Fittings)
PLUNGE POOL
Plunge pool in each unit with treated wooden decks around it as per design.
PAINTING
Internal Walls & Ceilings POP punning with acrylic/plastic emulsion paint
External finish Exterior emulsion/ textured paint
Elevation special features Stone cladding
ELECTRICAL
  • 100% DG back up
  • 15 KW power supply to all villas
  • Modular Switches Honeywell-MK/Viola/Crabtree/Equivalent
  • VRV- Air Conditioning system-Daikin or Equivalent make.
SECURITY
  • CCTV cameras on the site at various strategic
    locations
  • CCTV for individual villa- main entry & maids
    entry
  • Electronic access control
  • Intrusion alarm and motion detectors
  • Panic button
  • Gas leak detector
  • Video Door Phone
  • Intercom
  • 24 hr manned security

Send Enquiry

Name :  
Contact No. :  
Email ID :
City :
Message :