|
|
|
|
|
|
|
|
Overview
|
|
|
Mapsko Builders Launched a new Residential Project MAPSKO “Paradise”,
a two and
Three bedroom High Rise Ground +12th structure apartment at affordable cost with
high quality urban community living concept. Located in sec-83 right on NH 8 in
the new residential sectors of Gurgaon, Paradise is Part of 37 acres and located
adjacent to upcoming Metro Station.
|
Project Highlights of Mapsko Paradise Gurgaon
- Premium living with a affordable pricing.
- Access from NH-8 Expressway & Dwarka Expressway.
- Earthquake resistant building with eco-friendly designs.
- Open green spaces providing pollution free enviornment
- A km distance from upcoming ISBT & Metro Depot + 5 metro stations within 3kms radius.
- 24/7 electronic and manned security with cctv facility.
-
24/7 treated water supply.
- 100% power back up & high speed capacity lifts.
- Rain water harvesting system.
- Close to Malls, SEZs, IT Parks, Hotels and other Colonies etc.
- Facilities of schools, colleges & Hospital are available.
- 20 Min. drive from IGI Airport & 10Min. Drive from IFFCO Chowk.
- Twin Sector Road facility for more access.
- Club with multipurpose gymnasium with good facilities.
- onvenience shopping & solar street lighting.
|
|
|
Spec.
|
|
|
LIVING, DINING, & LOBBY/ Passage |
|
Floor |
Vitrified Tiles |
|
Walls |
Oil Bound destemper with pleasing shade |
|
BED ROOMS |
|
Floor |
wooden
Laminated in master bed & Vitrified tiles in Remaining bedroom |
|
Walls/ Celling |
Oil Bound destemper with pleasing shade with POP cornices OBD |
|
Balconies |
|
Floor |
Antiskid ceramic tiles
|
|
Walls/ Ceiling |
Permanent Paint Finish |
|
Kitchen |
|
Walls |
Ceramic Tiles up to 2 feet above counter & OBD in Balance area |
|
Floor
|
Antiskid Ceramic Tiles |
|
Counter |
Granite |
|
Fittings / Fixtures |
Branded CP Fittings. SS Single bowl/ Sinle drain board Sink. |
|
Toilets |
|
Walls |
Ceramic Tiles till 7' 0'' height, Mirror & Acrylic Emulsion Combination |
|
Floor
|
Antiskid Ceramic Tiles |
|
Counter |
Granite |
|
Fittings / Fixtures |
Branded CP Fittings, WC & Wash Basin |
|
Doors |
|
Entrance Door / Internal |
Seasoned Hardwood Frames with Moulded Skin Shutters |
|
Extrance Door / Internal |
Aluminum / U. P. V. C. / Wooden |
|
Hardware |
Aluminum |
|
Electrical |
Copper Electrical wiring throughout in concealed conduit with provisions for light point, power point, tv & phone sockets with protective MCBs. Modular switches.
Power back up each flat up to 1.5 KW (Mandatory) |
|
Security System / Fire Fighting System |
|
Single Entrance & Exit, Gated Community. Security Card System for entrance into
the complex.
CCTV in common areas. Fire Fighting System. |
|
Club Facility |
|
Club, Swimming Pool, Kids Pool, Gymnasium |
|
Facade |
|
Texture Finish |
|
* All specifications, amenities, facilities and perspective views are tentive in
nature and are subject to revision without prior intimation. |
|
|
|
Price List
|
|
|
PRICE LIST (W.e.f. - 10.09.10) |
|
Accommodation |
Area in sq.ft. |
Rates of Apartment |
|
2 BR + Living/Dining + 3 Balcones + 2 Toilets & Kitchen |
1050 Sq. Ft. |
Rs. 38,45000/- |
|
3 BR + Living/Dining + 3 Balcones + 3 Toilets & Kitchen |
1340 Sq. Ft. |
Rs. 49,45000/- |
|
Price Inclusive of: EDC & IDC , Power back-up , Club Membership , Covered Car Parking.
|
|
|
Preferential Location Charges (PLC) & Other Charges |
|
Park Facing |
Rs. 100/- per sq.ft. |
|
Corner Flat |
Rs. 50/- per sq.ft. |
|
Ground Floor |
Rs .100/- per sq.ft. |
|
1st Floor |
Rs. 75/- per sq.ft. |
|
2nd Floor |
Rs. 60/- per sq.ft |
|
3rd Floor |
Rs. 50/- per sq.ft. |
|
IFMS |
50/- per sq.ft. |
|
Power Back up Charges |
20,000/- Per KVA |
|
Car Parking Charges
|
|
Covered Car Parking if Required (Extra) : 200000/-
|
|
|
(Plan - A) INSTALLMENT PAYMENT PLAN |
|
Stages |
Installment To Be Paid |
|
At the time of Booking |
10% of TSP |
|
Within 45 Days of Booking |
10% of TSP |
|
At the time of agreement |
10% of TSP |
|
On start of excavation/ on start of construction |
10% of TSP |
|
On Completion of 2nd floor slab |
5% of TSP |
|
On Completion of 4th Floor Slab |
5% of TSP |
|
On Completion of 6th Floor Slab |
5% of TSP |
|
Onf Completion of 8th Floor Slab |
5% of TSP |
|
On Completion of 10th Floor Slab |
5% of TSP |
|
On Completion of 12th Floor Slab |
5% of TSP |
|
On Completion of Brick work |
5% of TSP |
|
On Completion of Internal Plaster |
5% of TSP |
|
On Completion of Flooring |
5% of TSP |
|
On Completion of external Plaster |
5% of TSP |
|
At the time of offer of possession |
5% of TSP + Registration Charges + other Charges as applicable |
|
(Plan- B) DOWN PAYMENT PLAN (10% Discount on TSP) |
|
Stage |
Installments to be Paid |
|
At the time of Booking |
10% of TSP |
|
within 30 days of Booking |
10% of TSP |
|
Within 45 days of Booking |
65% of TSP |
|
At the time of offer of possession |
5% of TSP + Registration Charges + Others Charges as applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|