|
|
|
|
|
|
|
|
Overview
|
|
|
The Project
Welcome to 154 Acres of sheer bliss. Welcome to Uniworld Resort. An impressive silhouette
of 25 free standing towers against a clear blue sky. The Residences at Uniworld
Resorts offers panoramic view of its landscaped surrounding.
The Location:
Just minutes away from the National Highway – 8 yet miles away from madness, Uniworld
Resorts is nestled in the heart of bustling development of Sector -33 & 48, off
the Sohna Road.
In addition to the excellent connectivity, the area boasts of premium health centres,
commercial offices, shopping complexes, education facilities & much more in the
vicinity.
Key Distances:
- 20 Km from airport.
- 7.5 km from IFFCCO chowk.
- 2.5 km from
Rajeev Chowk (at NH-8).
Common Amenities:
- Club facility with multipurpose room.
- Swimming pool.
- Abundant green
areas.
- Sports facility.
- Secured gated community.
|
|
|
Specifications
|
|
|
Proposed Specifications
|
|
STRUCTURE
|
|
STRUCTURE
|
EarthQuake resitent vROC Framed Structure
|
|
FLOORS
|
|
Living/Dining
|
Vitrified tiles flooring
|
|
Lift lobby
|
Stone/Vitrified Tiles
|
|
Bedrooms |
Laminated Wooden Floorings
|
|
Balcony |
Ceramic Tiles
|
|
Common Areas & Staircase |
Stone/Marble
|
|
Kitchen & Toilet |
Ceramic Tile Flooring
|
|
WALLS |
|
External
|
Exterior Paint
|
|
internal
|
Plastic Emulsion Paint
|
|
Lift Lobby
|
Combination of Stone & Paint
|
|
Kitchen
|
Ceramic tiles upto 600mm height above the counter
|
|
Toilet
|
Ceramic tiles upto 2100mm height
|
|
LIFT
|
|
Lift |
One Passenger and one service lift to each tower
|
|
COUNTERS
|
|
Kitchens
|
Granite counter with stainless steel sink with drain board
|
|
FITTINGS & FIXTURES
|
|
Toilets
|
EWC & wash basin in white color, single lever CP fittings,granite counter,Pipeline
for geyser
|
|
DOORS & WINDOWS
|
|
Internal Door
|
Seasons hardwood frames with moulded European style shutters
|
|
External Door
|
Anodized/ Powder coated glazed Aluminium doors
|
|
Main Door
|
Seasons hardwood frames with moulded European style shutters
|
|
Windows
|
Anodized/ Powder coated glazed Aluminium Windows
|
|
ELECTRICALS
|
|
Three Phase supply with independent meter, copper wiring in concealed conduits
|
|
TELEPHONE
|
|
One Telephone jack in each living room and master bedroom,Intercom facility to each
flat in living room
|
|
TELEVISION
|
|
TV points in each living room and master bedroom
|
|
POEWR BACK-UP
|
|
24x7 Power back-up
|
|
Price List
|
|
PRICE LIST
(w.e.f 01.06.09) |
|
Basic Sale Price(BSP) |
Rs. 3545/- per sq. ft.
|
|
PREFERENTIAL LOCATION CHARGES (PLC)
|
|
For Ground Floor |
Rs. 75/- per sq. ft.
|
|
For 1st Floor
|
Rs. 60/- per sq. ft.
|
|
For 2nd Floor
|
Rs. 50/- per sq. ft.
|
|
For Corner
|
Rs. 50/- per sq. ft.
|
|
For Landscape Facing (applicable upto G+7th Floor) |
Rs. 50/- per sq. ft.
|
|
(applicable upto G+7th Floor)
|
|
Interest Free Maintenance Security Deposit
|
Rs. 50/- per sq. ft.
|
|
CAR PARKING SPACE
|
|
Covered
|
Rs. 1,90,000/- per parking
|
|
Open
|
Rs. 1,15,000/- per parking
|
|
Club Membership Registration Charges
|
Rs. 50,000/-
|
- Basic Price mentioned above are escalation free and inclusive of External
Development Charges (EDC) & Infrastructure Development Charges (IDC).
- Any further
increase in EDC and IDC by the Statutory Authorities shall be borne by the Allottee.
-
The Company would pay to the Allottee(s) Rs. 5/- per sq. ft. per month of Super
Area for any delay in offering possession of the Apartment beyond the period of
30 months from the date of execution of the agreement to sell. Similarly, the allottee(s)
would also be liable to pay holding charges @ Rs. 5/- per sq. ft. per month of Super
Area if the allottee(s) fails to take possession of the Apartment within 30 days
from the date of issuance of the notice of possession.
- The Maintenance Charges
on the basis of Super Area of the Apartment as determined by the Company at the
time of offer of possession of the Apartment shall be payable in advance for a period
of two years before the Possession of the Apartment is offered to the Allottee(s).
-
Parking :
|
1BR
|
- One covered car parking is mandatory
|
|
2BR
|
- One covered car parking is mandatory
|
|
3BR with SQ
|
- One covered and One open car parking is mandatory
|
- The above Prices / Payment Plans are subject to revision/withdrawal at any time
without notice at the sole discretion of the Company.
|
|
PAYMENT PLANS
w.e.f 01.06.09
DOWN PAYMENT PLAN
Rebate 10% on Basic Sale Price
|
|
At the time of Registration of Application for Allotment
|
10% of BSP
|
|
Within 45 Days Of the date of Registration
|
85% of BSP + PLC + Parking + 50% of CMRC
|
|
On Notice Of Possession
|
5% of BSP + 50% of CMRC + Stamp Duty Fees and other charges as applicable
|
|
|
CONSTRUCTION LINKED INSTALLMENT PLAN
|
|
Stages
|
Payment
|
|
At the time of Registration of Application for Allotment
|
10% of BSP
|
|
Within 75 days of allotment
|
10%of BSP
|
|
Within 150 days of allotment |
10% of BSP |
|
On commencement of construction
|
10% of BSP + 50% of PLC
|
|
#On casting of Ground Floor Roof
|
10% BSP + 50% of PLC
|
|
On casting of Third Floor Roof
|
10% of BSP + 50% of CMRC
|
|
On casting of Sixth Floor Roof
|
5% of BSP + 50% of Parking
|
|
On casting of Ninth Floor Roof
|
5% of BSP + 50% of Parking
|
|
On casting of Twelfth Floor Roof
|
5% of BSP
|
|
On casting of Top Floor Roof
|
5% of BSP
|
|
On completion of masonry work in the Apartment
|
5% of BSP
|
|
On completion of internal plastering in the Apartment
|
5% of BSP
|
|
On completion of flooring within Apartment
|
5% of BSP
|
|
On notice of possession
|
5% of BSP + 50% of CMRC+ Stamp Duty
Fees and any other charges as applicable
|
BSP = Basic Sale Price
CMRC = Club Membership Registration Charges
PLC = Prefrential Location Charges |
|
*
Other charges include Maintenance Security, Maintenance Charges, Stamp Duty Charges,
Registration Fees and other charges payable as per agreed terms.
|
|
# This installment and installments listed hereunder shall become
payable on demand irrespective of the serial order in which they are listed.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|