|
|
|
|
|
|
|
|
Overview
|
|
|
Cohesive Living With Elements Of Nature :
|
The airy home at Sunbreeze are designed expertly to let you feel close to
nature, even when you are indoors. As you take a walk along the landscaped greens
in The outdoors, getready to lose yourself in the aura of nature's rhapsody to connect
with your inner-self.
|
|
A secret garden od experiences to be unreservedly savoured, Sunbreeze redefines
the essence of an invigorating residential living. |
|
|
|
|
|
|
|
|
Floors
|
FLOOR PLAN FOR SUNBREEZE |
|
1826 Sq. ft. (Type Y1) 4 Bebroom, 4TSQ + Store |
|
1807 Sq. ft. (Type Y2) 4 Bedroom, 4 TSQ
|
|
1656 Sq. ft. (Type Y3) 4 Bedroom, 4 TSQ + Store
|
|
1628 Sq. ft. (Type Y4) 4 Bedroom, 4 TSQ
|
|
1501 Sq. ft. (Type Z1) 3 Bedroom, 3 TSQ
|
|
1501 Sq. ft. (Type Z2) 3 Bedroom, 3 TSQ
|
|
1467 Sq. ft. (Type Z3) 3 Bedroom, 3 TSQ
|
|
1100 Sq. ft. (Type Z4) 2 Bedroom, 2T + Study
|
|
1337 Sq. ft. (Type Z5) 3 Bedroom, 3 TSQ
|
|
1337 Sq. ft. (Type Z6) 3 Bedroom, 3 TSQ
|
|
1303 Sq. ft. (Type Z7) 3 Bedroom, 3 TSQ
|
|
968 Sq. ft. (Type Z8) 2 Bedroom, 2T + Study
|
|
Specification
|
|
|
SPECIFICATION FOR SUNBREEZE |
|
STRUCTURE |
|
Structure |
RCC framed earthquake resistant structure |
|
WALL FINISH |
|
Internal |
Oil bound distemper |
|
Srevant Quarter/Store |
Oil bound distemper |
|
External |
Exterior paint |
|
Lift Lobbies |
Combination of paint and stone/tiles |
|
FLOORING
|
|
Living/Dining/Bedrooms |
Vitrified tiles |
|
Sreavant Quarter/Store |
Ceramic tiles |
|
Lift Lobbies |
Stone/Vitrified tiles |
|
KITCHEN |
|
Flooring |
Ceramic tiles |
|
Dado |
Ceramic tiles till 600 mm above counter area, rest painted with oil bound distemper |
|
Fitting |
Granite counter with stainless steel sink and drain board |
|
DOORS
|
|
Main Entry |
Seasoned hardwood frame with European style moulded shutter |
|
Internal Doors |
Seasoned hardwood frame with European style moulded shutter |
|
TOILETS
|
|
Flooring |
Ceramic tiles |
|
Dado |
Select ceramic tiles upto 2100 mm |
|
Fitting |
Granite counter, white sanitary fixtures, single lever CP fittings, pipe lines for
geysers |
|
BALCONIES |
|
Flooring |
Ceramic tiles |
|
Windows/External Door |
Powder coated/anodised aluminium glazing |
|
Electrical |
Copper electrical wiring in concealed conduits and modular switches |
|
Power Back-Up |
24 x 7 power back-up |
|
Communication |
TV and telephone points in living room & master bedroom only intercom facility
to each flat in living room |
|
All floorplan, sitemap, specifications, amenities, facilities and perspective views
are tentative in nature and are subject to revision. |
|
Price List
| |
| |
| BSP (3BHK) - |
Rs 2914 psf less Rs 150 psf Inaugral Discount = 2764/- per sq ft. The EDC is 298/- , IDC is 33/-, EDC+IDC=331/and the total cost is 2764 + 331= 3095 Incl of EDC/ IDC. |
| BSP (4BHK) - |
Rs 2914 psf less Rs 200 psf Inaugral Discount = 2714/- per sq ft. The EDC is 298/- , IDC is 33/-, EDC+IDC=331/ and the total and the total cost is 2689 + 331= 3045 Incl of EDC/ IDC. |
|
| |
Area
sq ft |
Accomm
odation |
Basic Price |
Car Parking |
No. of Parking’s |
Club Memb ership |
IBMS |
Total Cost |
Booking
Amount |
| 968 |
2bhk+2bath |
2,995 |
1,90,000 |
1 |
40,000 |
48,400 |
31,77,560 |
Closed |
| 1,100 |
2bhk+2bath+sq |
2,995 |
1,90,000 |
1 |
40,000 |
55,000 |
35,79,500 |
Closed |
| 1,337 |
3bhk+3bath+sq |
3,095 |
1,90,000 |
1 |
40,000 |
66,850 |
44,34,865 |
10% |
| 1,501 |
3bhk+3bath+sq |
3,095 |
1,90,000 |
1 |
40,000 |
75,050 |
49,50,645 |
10% |
| 1,628 |
4bhK+4bath+sq |
3,045 |
3,05,000 |
1 |
40,000 |
81,400 |
53,83,660 |
10% |
|
| |
|
PRICE LIST |
|
Basic Sale Price(BSP) |
Rs. 2914/-per sq. ft. |
|
External Development Charges |
Rs. 298/- per sq. ft. |
|
Infrastructure Development Charges |
Rs. 33/- per sq. ft. |
|
PREFERENTIAL LOCATION CHARGES (PLC) |
|
For Ground Floor |
Rs. 75/- per sq. ft. |
|
For 1st Floor |
Rs. 60/- per sq. ft. |
|
For 2nd Floor |
Rs. 50/- per sq. ft. |
|
For Corner |
Rs. 50/- per sq. ft. |
|
For Lanscaping Facing (upto G+7) |
Rs. 50/- per sq. ft. |
|
Interest Free Maintenance Security Deposit |
Rs. 50/- per sq. ft. |
|
CAR PARKING SPACE |
|
Covered |
Rs. 1,90,000/- per parking |
|
Open |
Rs. 1,15,000/- per parking |
|
Club Membership Registration Charges |
Rs. 40.000/- |
|
Basic Price mentioned above are escalation free and exclusive of External Development
Charges (EDC), Infrastructure Development Charges (IDC). |
|
Any further increase in EDC and and IDC by the Statuory Authorities shall be borne
by the Allottee. |
|
The Company would pay to the Allottee(s) Rs. 5/- per sq. ft. per month of Super
Area for any delay in offering possession of the Apartment beyond the period of
36 months from date of execution of the agreement of Super Area if the allottee(s)
fails to take possession of the Apartment within 30 days from date of issuance of
the notice of possession. |
|
The Maintenance Charges on the basis of Super Area of the Apartment as determined
by the Company at the time of offer of possession of the Apartment shall be payable
in advance for a period of tow years before the Possession of the handed over to
the Allottee(s). |
|
PARKING |
1 BR, 2 BR & 3 BR - One covered car parking is mandatory
4 BR
- One covered & one open car parking is mandatory |
|
The above Prices/Payment Plans are subject to revision/withdrawal at any time without
notice at the sole discretion of the Company. |
|
DOWN PAYMENT PLAN
(Rebate 10% on Basic Sale Price) |
|
At the time of Registration of Application for Allotment |
10% of BSP |
|
Within 45 Days of the date of Registration |
85% of BSP + PLC + Parking + 50% of CMRC |
|
On Notice of Possession |
5% of BSP + 50% of CMRC + Stamp duty charges and other charges as applicable |
|
CONSTRUCTION LINKED INSTALLMENT PLAN |
|
At the time of Registration of Application for Allotment |
10 % BSP |
|
Within 75 days of allotment |
10 % BSP |
|
Within 150 days of allotment |
10 % BSP |
|
On commencement of construction |
10% of BSP + 50% of PLC |
|
# On casting of Ground Floor Roof |
10% of BSP + 50% of PLC |
|
On casting of Third Floor Roof |
10% of BSP + 50% of CMRC |
|
On casting of Sixth Floor Roof |
10% of BSP + 50% of Parking |
|
On casting of Ninth Floor Roof |
10% of BSP + 50% of Parking |
|
On casting of Eleventh Floor Roof |
5% of BSP |
|
On casting of Top Floor Roof |
5% of BSP |
|
On completion of masonry work in the apartment |
5% of BSP |
|
On completion of internal plaster within the apartment |
5% of BSP |
|
On completion of flooring within apartment |
5% of BSP |
|
On notice of possession |
5% of BSP + 50% of CMRC + Stamp duty charges and any other charges as applicable |
BSP = Basic Sale Price
CMRC = Club Membership and Registration Charges
PLC = Preferential Location Charges |
Other charges include Maintennance Security, Maintenance Charges, Stamp Duty Charges,
Registration Fees and othre charges payable as per the agreed terms
# This installment and installments listed hereunder shall become payable on demand
irrespective of the serial order in which they are listed |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|